<\/strong>\n<\/h3>\n\n\n\nPhase 1: Handling 50,000 barrels of oil and injected 70 million cubic feet of gas a day<\/p>\n\n\n\n
Phase 2: Achieve 110,000 barrels of oil and inject 210 million cubic feet of gas a day<\/p>\n\n\n\n
Geographical location of the project:<\/h3>\n\n\n\n
\u0622\u06cc\u0627 \u0645\u0646\u0638\u0648\u0631 \u0634\u0645\u0627 \u0627\u06cc\u0646 \u0627\u0633\u062a: \u06f3\u06f0 \u06a9\u06cc\u0644\u0648\u0645\u062a\u0631\u06cc \u0634\u0645\u0627\u0644 \u062e\u0631\u0645\u0634\u0647\u0631 \u0648 \u06f1\u06f0\u06f0 \u06a9\u06cc\u0644\u0648\u0645\u062a\u0631\u06cc \u062c\u0646\u0648\u0628 \u063a\u0631\u0628\u06cc \u0627\u0647\u0648\u0627\u0632\u060c \u062f\u0631 \u0627\u0645\u062a\u062f\u0627\u062f \u062c\u0627\u062f\u0647 \u0627\u0647\u0648\u0627\u0632 \u2013 \u062e\u0631\u0645\u0634\u0647\u0631 \u06f8\u06f6\/\u06f5\u06f0\u06f0\u06f0 30 km north of Khorramshahr and 100 km southwest of Ahwaz, along the Ahwaz-Khorramshahr road<\/p>\n\n\n\n
main contractor:<\/h3>\n\n\n\n
Phase 1 and 2 ENI \/ NICO<\/p>\n\n\n\n
Project Implementation Activities:<\/h3>\n\n\n\n
Drilling of 3 wells and 5 wells and one well gas injection well\n The creation of a unit of operation with a nominal capacity of 55 thousand barrels per day\nAll pipelines and pipelines in the first phase of the project\n Drilling 15 development loops, 3 gas injection wells and one wells water disposal\nZayed, along with the creation of a unit of operation with a nominal capacity of 165 thousand barrels of oil\nOn the day, including all lines of flow and well-developed facilities in the second phase<\/p>\n\n\n\n
– Feasibility Study Phase III was conducted by ENI<\/p>\n\n\n\n
– Define the descriptive stage of the design and preparation of documents for this part of the work using internal resources<\/p>\n\n\n\n
Key layout times:<\/h3>\n\n\n\n
Date of Contract Entry: April 13,<\/p>\n\n\n\n
Production of 50,000 barrels per day will be achieved on August 83<\/p>\n\n\n\n
Production forecast reached 160 thousand barrels per day: September, 2002<\/p>\n\n\n\n
Forecast of gas injection at 280 million cubic feet per day: Spring 2010<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"
Objectives of the project: Phase 1: Handling 50,000 barrels of oil and injected 70 million cubic feet of gas a day Phase 2: Achieve 110,000 barrels of oil and inject 210 million cubic feet of gas a day Geographical location of the project: \u0622\u06cc\u0627 \u0645\u0646\u0638\u0648\u0631 \u0634\u0645\u0627 \u0627\u06cc\u0646 \u0627\u0633\u062a: \u06f3\u06f0 \u06a9\u06cc\u0644\u0648\u0645\u062a\u0631\u06cc \u0634\u0645\u0627\u0644 \u062e\u0631\u0645\u0634\u0647\u0631 \u0648 \u06f1\u06f0\u06f0 […]<\/p>\n","protected":false},"author":177,"featured_media":31,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":[],"portfolio_cat":[132,124],"portfolio_tags":[],"_links":{"self":[{"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/portfolio\/1419"}],"collection":[{"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/users\/177"}],"replies":[{"embeddable":true,"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/comments?post=1419"}],"version-history":[{"count":0,"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/portfolio\/1419\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/media\/31"}],"wp:attachment":[{"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/media?parent=1419"}],"wp:term":[{"taxonomy":"portfolio_cat","embeddable":true,"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/portfolio_cat?post=1419"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/sinapush.com\/wp-json\/wp\/v2\/portfolio_tags?post=1419"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}